Feasibility studies for construction projects
Contents |
[edit] What are feasibility studies?
Feasibility studies are preliminary investigations undertaken in the very early stage of a project to assess whether the project is viable. They tend to be carried out when a project is relatively large or complex, or where there is some doubt or controversy regarding the proposed development.
[edit] What is the purpose of feasibility studies?
The purpose of feasibility studies is to:
- Establish whether the project is viable.
- Help identify a range of feasible options.
- Begin the process of preparing other project documentation such as a clarifying the business need, formulating a business case, scoping a project execution plan and strategic brief and so on.
[edit] What might a feasibility study include?
On large, complex or controversial projects, there may be a number of different feasibility studies carried out for different aspects of the project, for different purposes, or for different possible solutions. These might require different skills, and could consider issues such as:
- The likelihood and ease of obtaining planning permission.
- The likelihood that an environmental impact assessment will be required.
- Other legal/statutory approvals that might be required.
- Analysis of the budget relative to client requirements.
- Assessment of the potential to re-use existing facilities or doing nothing rather than building new facilities.
- Assessment of any existing site information that is available.
- Initial site appraisals, including geotechnical studies, assessment of any contamination, availability of services, uses of adjoining land, easements and restrictive covenants, environmental impact, and so on.
- Considering different solutions to accessing potential sites.
- Analysis of accommodation that might be included or excluded.
- Assessment of the possible juxtaposition of accommodation.
- The preparation of basic stacking diagrams.
- Assessing operational and maintenance issues.
- Appraisal of servicing strategies.
- Programme considerations.
- Procurement options.
Feasibility studies are not part of the design process, they are assessments of viability, potential opportunities and constraints.
Various stakeholders, statutory authorities and other third parties may need to be consulted in the preparation and assessment of feasibility studies. The assessments carried out should be presented in a structured way so the client can decide whether or not to proceed to the next stage. Wherever possible, any information prepared or obtained should be in a format which can be readily shared and used, and should be stored and named in a way consistent with the long-term project and operational needs.
[edit] What happens after feasibility studies?
After assessing the feasibility studies, the client will decide whether to proceed to the next stage and if so, which options should be developed in more detail. Ideally there will be no more than four options at this stage. If more options exist it may be necessary to carry out further high-level studies before proceeding to more detailed options appraisals.
Options appraisals assess and compare a number of potential options before developing a concept design for the preferred option. Options appraisals might include diagrammatic options studies that enable the client to understand the broad pros and cons of the available options so that a preferred option can be selected.
For more information see: Options appraisals.
[edit] Related articles on Designing Buildings
- Briefing documents.
- Business case.
- Client requirements.
- Concept.
- Concept design.
- Constraints.
- Development appraisal.
- Environmental Impact Assessment.
- Options review report.
- Planning permission.
- Site appraisals.
- Site information.
- Spatial diagram.
- Stacking diagram.
- Statutory approvals.
- Strategic brief.
Featured articles and news
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
Comments
To make a comment about this article, click 'Add a comment' above.
Separate your comments from any existing comments by inserting a horizontal line.